Reference Projects
- MLS Lopper: SHIPTEC Lucerne fitted the freight ship MLS Lopper with new diesel motors in 2008.
- MLS Mars: SHIPCTEC fitted the freight ship MLS Mars with a new diesel motor and an attached particle filter in 2007. The installation of a particle filter was a first in Switzerland. SHIPTEC was in charge of the entire project, from the planning to the implementation phase.
- LS Stans: In 2005 SHIPTEC Lucerne was commissioned by the WABAG Kies AG to design and construct a completely new pilot house for the freight ship LS Stans. As part of the contract, a new heating system and a replacement for the old pressure boiler had to be installed as well. SHIPTEC managed to complete these works within just three weeks!